Post-Dated Cheque Schedule Maker (Free Tool for EMI & Rent)

Giving a landlord twelve rent cheques, or a finance company a full set of EMI cheques, means writing the same thing again and again with only the date changing. One wrong date and the cheque either bounces as “post-dated” or sits unused. Put in the amount, the first date and how many cheques you need, and this tool gives you the full list: every cheque date, cheque number, and the amount in figures and words.

How to use it

  1. Type the payee’s name if you want it on the list (it’s optional).
  2. Enter the amount of each cheque, for example 18500.
  3. Pick the date of the first cheque and how many cheques you are giving.
  4. Choose how often: every month, every 3 months, every 6 months, every 2 weeks or every week.
  5. If you know the first cheque number, type it. The tool numbers the rest in order, keeping the leading zeros.
  6. Click Make schedule. You can download it as a CSV that opens in Excel, copy it, or print it.

How the dates are worked out

Monthly cheques keep the same day every month. If you start on the 31st, months that are shorter get their last day instead, so 31 January is followed by 28 February (or 29 in a leap year) and then 31 March. That way no cheque carries a date that doesn’t exist, which is one of the easiest ways to get a cheque returned.

Things to keep in mind with post-dated cheques

  • The bank won’t pay before the date. If someone deposits a PDC early, it comes back with the reason “Instrument post dated”.
  • Each cheque is valid for 3 months from its own date. A cheque dated 5 June can be deposited from 5 June till early September. You can check any date with our cheque validity checker.
  • Keep the balance ready. A PDC is just a normal cheque on its date. If the money isn’t there, it bounces like any other cheque.
  • Write the details down. Keep the list from this tool with your papers, or add the cheques to a cheque register. When a payee calls about “the March cheque”, you’ll know the number and amount in seconds.
  • Large cheques: For cheques of ₹50,000 and above, many banks ask you to share the details in advance under the Positive Pay System. Check with your bank before you hand over a set of high-value PDCs.

Print the whole set in one go

Once the schedule is ready, MoneyFlex can print all those cheques for you, with dates, payee name and amount in words, and it keeps counting the days left on every post-dated cheque.

Download Free Trial (3 Days)

Questions people ask

Can I make a schedule for EMI cheques with different amounts?

This tool keeps one amount for all cheques, which is how most EMI and rent cheques work. If one cheque is different, download the CSV and change that row in Excel.

Is my data saved anywhere?

No. Everything is worked out in your own browser. Nothing you type is sent to us.

Can I stop a post-dated cheque later?

Yes. You can ask your bank to stop payment on a cheque before it is paid. Remember that stopping a cheque given against a real debt can still lead to legal trouble, so talk to the payee first.